Get Social With CityScene STL.
  • Facebook - White Circle
  • Twitter - White Circle
  • Instagram - White Circle
  • Flickr - White Circle

Copyright 2018-2019 CityScene STL. Version 8.

Nov 11, 2018

Northside-Southside MetroLink

2 comments

A plan to expand the MetroLink system by connecting North St. Louis to South St. Louis. Cost is estimated to go over $660 Million for the street running system. A map of the route is included.

 

Anyone have any updates on this?

What are the chances of this getting built? Would love to see it.

New Posts
  • So some talk is starting as to whether or not allow a private company to invest money into a public transit system that is elevated, run by solar power and requires no public subsidies to be completed. It would be privately financed by Transit X, a company based in Boston. According to them, they are going to begin building a pilot route in the suburbs of Atlanta. Transit X hopes for it to be a great alternative to MetroLink but also something that improves Metro. The first route will be 54 miles (that's if its completed) and fares will be pretty cheap. Transit X would cost $6 Million per-mile to build while MetroLink North-South will cost $40.7 Million to build. Other highlights... - $319 Million total for started line - 15% of population to be within walking distance is stations (5 minute walk) - No public subsidies - Can be easily expanded - Full route could be built in one year as construction can be "mile a week"- $30 Million pumped into local economy off of fees and taxes. CityScene STL piece: https://www.cityscene-stl.com/news/an-alternative-transit-system-for-st-louis-transit-x Opinion STLToday Piece: https://www.stltoday.com/opinion/columnists/transit-x-offers-a-viable-solution-to-transit-problems/article_c6ec836c-ca91-5f3a-80cb-2cdf82851792.html?fbclid=IwAR0ZMkACi2RC9NLtbGDLM3yjOK_1sqM1kcuZF9ptM4vsJaocpbC810oa83g Official Proposal: http://transitx.com/proposals/Transit_X_for_St_Louis,MO-phase_1.pdf?fbclid=IwAR00QHNAgtpD54WRaDzW_vmszmiZrlF7AqU8-JQiz6B4784P7sWC_2DpRKc
  • Fox 2 News is reporting that MODOT has suspended construction on the bridge replacement project at Shrewsbury due to "credit card sized cracks". Nothing says quality like having to reconstruct the bridge in the summer because it is structurally not sound. Fox 2 News: MODOT suspends construction of I-44 bridge at Shrewsbury Let's also not forget the multiple bridge replacements from Macklind to Grand on 44. In other words, just stay off I-44 from Laclede Station to Grand till Late 2019 just to save yourself a headache.
  • This is meant to help bikes get first priority when crossing Vandeventer. In my opinion, it's a waste as drivers will ignore the box and proceed all the way up to Vandeventer but I give props to Trailnet for creating something like this. The rendering may or may not hint at future changes to come to Vandeventer.